Showing posts with label Wigan. Show all posts
Showing posts with label Wigan. Show all posts

Wednesday, 22 May 2024

They've shrunk Wigan!

I'm returning to a rather old project which got parked in the long grass many years ago. I won't share details yet as I may not have time to finish it, but I will say that it involves maps, specifically maps of cycle routes to complement the route descriptions on this blog. So my starting point was to try and get my hands on copies of all the Transport for Greater Manchester cycle network maps. That didn't succeed, as the 2022 maps are now out of print and TFGM are waiting for all the local councils to update their routes, so despite several attempts I still don't have copies of three of the maps.

So, the alternative approach was to download the PDF versions of the maps and print them out on A3 paper. This turned out to be quite a good way of visualising the GM cycle routes as I could tape the sheets together and make one big GM cycling map, except there was one problem...

The sheets for Wigan, on the left, could be matched up with each other, but didn't fit into the rest of the maps. It took a few attempts before the penny dropped, they are a different scale to the rest of the maps. While the scale on the Wigan maps insist that the map is a 1:16,000 scale, like all the others, it is actually 1:20,000. On closer inspection it is clear that the Wigan maps have been shrunk, rather than re-scaled, with smaller text and narrower lines.

So, possibly ever since they were first produced, the Wigan cycle network maps have been printed with the wrong scale, just one of the many errors that persist in this map series, along with non-existent cycle routes. 

I eventually managed to fit Wigan into the rest of the maps by up-scaling the sheets on the printer, so I can get on with the next stage of the project.





Sunday, 24 April 2016

Leigh Guided Busway Cycle Track

Most of these photos are from a bike ride a couple of weeks ago, co things may have changed. The rest are from June 2013 as work on the busway began.

This route starts at the end of the Tyldesley Loopline at Ellenbrook. However conditions on this route are dreadful at the moment, so best get to here by road at the moment.

The busway opens out like a huge gaping mouth, and quite dwarfs the cycle track which goes round the back of the shelter to the right.



Quite a contrast to the old cycle route.



The busway entrances all contain car traps - we could do with those on a few cycle lanes!



This was how the signs promotedthe busway durring the early preparation works - note the emphasis on horses - not a cycle to be seen. Clearly the equestrian lobby have good contacts at TfGM.



Evidence of horses is already beginning to accumulate on the path - horse riders should have the same duty as dog walkers to remove their animal's excrement from public places.

The surface of the path is very poor. It is a loose gravel surface and very uneven. It has been clearly chosen to favor horses over pedal cycles. It is almost certainly going to be unsuitable for hand trikes and road bikes.



The road crossings are all on the level, despite this being an old railway route, each equipped with button operated traffic lights. This is the City Road crossing.



The majority of people using the path that day were walking dogs,



but I did see quite a few people on bikes.



There are no barriers to prevent access by cars. However, as there has already been one crash on the busway, there will need to be regular access for cranes to move stranded buses.



This vehicle was from a security firm, parked at the junction with Mosely Common Road. Here the railway line used to go under the road.



Over the road there was fencing across the path, but it had been moved aside.



Here the track was quite narrow and the cycle path goes up onto the embankment, as it did before the works.



The track runs alongside Chester Road with no obvious means of stopping it from being used as a car park once the fencing goes.



More opened fencing at Hough Lane crossing



At this point the old railway track went under a bridge.



This was the view from just beyond in 2013.  Upton Lane still crossed the trackbed by bridge at this point.



The cycle track crosses the busway in a couple of places.



The notices warn that trespass on the busway is a criminal offence - shame the same can't be said for cars on cycleways.



The next road crossing is Well Street.



A little further along the path reaches Astley Street where this bus station has been created.



Again a lot of earth moving has been done to create this.



At this point the path ran out. It is completely un-surfaced and closed between here and Holden Road in Leigh itself. Whilst this could be an excellent route for cycle commuting, TfGM clearly want you to get on the bus.



Whilst the cycle path may be unfinished and poorly surfaced, the car park is properly tarmaced and already in service.



To get to the other end involved a 3.5 mile diversion with road conditions like this...



The other end of the gap at Holden lane.



The last section of path is tarmaced but narrow.



It brings you out to yet more freshly tarmaced car parks.



Two of them, on on either side of the cycle path



which brings you out onto the pavement at East Bond Street.



Generally, this route is a bit of a disappointment. We are pretty sure that the poor quality surface is as TfGM intended, as this message shows.



Hopefully, the rest will be open soon for those who wish to cycle rather than sit on a bus, provided the uneven surface doesn't put them off.

Sunday, 2 November 2014

Cycle Forums in Greater Manchester

I've taken on the task of getting all the cycle forums into the Love Your Bike Cycling Events Calendar and there is quite a contrast between the different councils.



Manchester Cycle Forum runs every quarter, is chaired by a city councillor and usually packs out the room it is held in. Details of the meetings are posted on the council web site, but agendas and minutes of the meetings are not posted on the web site.

Salford Cycle Forum is also held quarterly, run by the cycling officer. Details of the meeting are available on the council web site along with agendas and "Action Sheets".

Trafford Cycle Forum is held quarterly. It is chaired by a cycle campaigner rather than an officer or councillor. Agendas and Minutes are both posted on the web site and the meetings are well attended.

Oldham Cycling Forum has restarted this past year and is an ad hoc affair. There is no information on the web site and meetings have come to my attention via twitter, so I have publicised them as best I can. Some details have also been posted on the TfGM web site.

Stockport Council’s Public Cycle User Group "meets once per month in the Town Hall, and is open to all cyclists and others who have an interest in cycling." There is a web page with the most recent draft minutes. In fact the general meetings are every other month with specialised meetings in the other months. Attendance is a bit smaller.

Bolton "At long last, the Bolton Cycle Forum is back! The next meeting will be on Wednesday, 12th November 2014, starting at 6pm." First meeting will be at the The Bolton Artillery Suite, Bolton Town Hall, Victoria Square, Bolton, BL1 1SA. So far this information hasn't reached the council's cycling web page I could find.

Bury Cycling Forum "was established in 1996 at the request of local cyclists. Until 2011 it met four times a year to discuss cycling issues and was attended by cyclists, Council officers and occasionally, Council Members. The Council doesn't currently have a cycling officer so meetings of the forum are not being convened." So this is a dead cycle forum.

Tameside is another dead cycle forum, it folded over four years ago.

Rochdale has no sign of a cycle forum, and very little info on their web pages.

Wigan also has no sign of any consultation on cycling, there are just the usual platitudes on cycling on their web site.