Ellenbrook Loopline


The Ellenbrook Loopline is a short 1.4km rail path from the Leigh Guided Busway at Newearth Road to the Roe Green Loopline, east of Parsonage Road. There has been a path of sorts here for some time, but it never seemed worth a post as it was in very poor condition and was blocked at the western end. However, Salford council upgraded the path last year and the path now makes a useful and usable link.



The entrance off the busway path is well signposted and marked with clear signage, though it is debatable as to how long these will last, given that some have been vandalised elsewhere.



There is a token barrier as you join the path, but nothing too difficult for a bike and trailer or trike.



The first striking thing you notice when you join the path is the surface, it's fantastic!

Compared to the grit strewn, noisy, uneven busway path this is a delight. It is 50% recycled tyres and so quiet. It is also slightly soft and very grippy, so far, far safer than the dreadful surfaces covered in grit. It also has a well laid, even finish and looks like it is porous, so water can drain through it.

This should set the standard for all new rural cycle routes!



The route starts on the old railway route,



but drops off the line of the railway on the approach to Mather Fold Road.



Here there is a bit of a diversion round the gates close to the old Valve House - left of the photo below.



Again there are barriers, but not too much of a problem.



Then back up onto the railway route.



However at Hilton Lane there is a missing bridge, so the path drops quite sharply to road level.



A somewhat odd combination cycle/pedestrian crossing doesn't feel particularly safe and not sure about it's legal status...



On the other side of the road the gradient is really steep. According to the plans this shouldn't be any steeper than 1 in 12, but with a sharp corner half way up it's a bottom gear climb or get off and push, with steps for walkers.



Next the bridge takes the path under the railway,



and then opens out for a short while before closing in again



and curving round to the left to join the Roe Green Loopline.



The entrance at this end is marked by another of the large rectangular sign.



The upgrade has turned a difficult muddy route into a useful short link with a fantastic surface. It's so quiet you can enjoy the sound of the birds as you cycle along.


Sunday, 24 April 2016

Leigh Guided Busway Cycle Track

Most of these photos are from a bike ride a couple of weeks ago, co things may have changed. The rest are from June 2013 as work on the busway began.

This route starts at the end of the Tyldesley Loopline at Ellenbrook. However conditions on this route are dreadful at the moment, so best get to here by road at the moment.

The busway opens out like a huge gaping mouth, and quite dwarfs the cycle track which goes round the back of the shelter to the right.



Quite a contrast to the old cycle route.



The busway entrances all contain car traps - we could do with those on a few cycle lanes!



This was how the signs promotedthe busway durring the early preparation works - note the emphasis on horses - not a cycle to be seen. Clearly the equestrian lobby have good contacts at TfGM.



Evidence of horses is already beginning to accumulate on the path - horse riders should have the same duty as dog walkers to remove their animal's excrement from public places.

The surface of the path is very poor. It is a loose gravel surface and very uneven. It has been clearly chosen to favor horses over pedal cycles. It is almost certainly going to be unsuitable for hand trikes and road bikes.



The road crossings are all on the level, despite this being an old railway route, each equipped with button operated traffic lights. This is the City Road crossing.



The majority of people using the path that day were walking dogs,



but I did see quite a few people on bikes.



There are no barriers to prevent access by cars. However, as there has already been one crash on the busway, there will need to be regular access for cranes to move stranded buses.



This vehicle was from a security firm, parked at the junction with Mosely Common Road. Here the railway line used to go under the road.



Over the road there was fencing across the path, but it had been moved aside.



Here the track was quite narrow and the cycle path goes up onto the embankment, as it did before the works.



The track runs alongside Chester Road with no obvious means of stopping it from being used as a car park once the fencing goes.



More opened fencing at Hough Lane crossing



At this point the old railway track went under a bridge.



This was the view from just beyond in 2013.  Upton Lane still crossed the trackbed by bridge at this point.



The cycle track crosses the busway in a couple of places.



The notices warn that trespass on the busway is a criminal offence - shame the same can't be said for cars on cycleways.



The next road crossing is Well Street.



A little further along the path reaches Astley Street where this bus station has been created.



Again a lot of earth moving has been done to create this.



At this point the path ran out. It is completely un-surfaced and closed between here and Holden Road in Leigh itself. Whilst this could be an excellent route for cycle commuting, TfGM clearly want you to get on the bus.



Whilst the cycle path may be unfinished and poorly surfaced, the car park is properly tarmaced and already in service.



To get to the other end involved a 3.5 mile diversion with road conditions like this...



The other end of the gap at Holden lane.



The last section of path is tarmaced but narrow.



It brings you out to yet more freshly tarmaced car parks.



Two of them, on on either side of the cycle path



which brings you out onto the pavement at East Bond Street.



Generally, this route is a bit of a disappointment. We are pretty sure that the poor quality surface is as TfGM intended, as this message shows.



Hopefully, the rest will be open soon for those who wish to cycle rather than sit on a bus, provided the uneven surface doesn't put them off.

Sunday, 17 April 2016

Tyldesley Loopline Update, Roe Green to Ellenbrook

I last rode the Tyldesley Loopline between Roe Green and Ellenbrook back in August 2014.

Salford council held a consultation about improving this route last December and it seems that there have been some works carried out - sadly that has resulted in the route being almost un-ridable for the time being.

Starting at the junction with the Roe Green Loopline, the path is in reasonable condition.



There are signs of the trees having been cut back, but initially the surface is rideable.



However, the path worsens at this point.



It is seriously muddy, no place for racing bikes...



After the bridge under the East Lancs Road the path goes up steeply to the left and open water appears on the trackbed.



From here the path on the top of the embankment is a bit muddy, but rideable, whilst the trackbed looks more like a lake.



Once the path returns to the trackbed things get much worse



Here the preparation works have churned up the trackbed.



At this point it is very difficult to make progress. The mud is several inches deep in places, and you get wheelspin on the flat.



These conditions last all the way to Ellenbrook and the start of the guided busway.