Showing posts with label Salford. Show all posts
Showing posts with label Salford. Show all posts

Monday, 22 June 2020

Liverpool Street Popup Cycle Crap

There has been plenty of bullshit around popup cycle facilities in this area.

However, the reality on the ground is pretty dreadful.

Even before I got to Liverpool Street today, this shit blocked the cycle track.



Like many of the dreadful private hire drivers in the area this one has registered their vehicle as a private hire in Wolverhampton...



Mind you once I reached Liverpool Street, a local post person blocked the cycle lane with their van.



After that was the proof, if needed, that temporary cycle facilities, are just that, temporary.

Easily damaged, in this case it looks like a motor vehicle had hit the plastic barriers and blocked the cycle lane.



Salford council clearly couldn't care less about this facility. It is shit. There has been no effort to repair the dreadful road surface.

This is just not good enough!

Monday, 10 February 2020

Irwell Towpath - WTF?

This idiotic design for the new bridge over the entrance to the night soil dock was exposed for all it's shortcomings over the weekend. Some idiot with no experience of the force of the Irwell in flood thought it was a good idea to put in a loose surface!



Large amounts of it got washed away on Sunday leaving this mess!



The crap in the railings show just how high the water reached.

 

Much of the rest of the path is covered in up to 10cm of silt - so it's pretty much out of action for the foreseeable future.

Salford Council fail again!

Sunday, 5 August 2018

Ellenbrook Loopline


The Ellenbrook Loopline is a short 1.4km rail path from the Leigh Guided Busway at Newearth Road to the Roe Green Loopline, east of Parsonage Road. There has been a path of sorts here for some time, but it never seemed worth a post as it was in very poor condition and was blocked at the western end. However, Salford council upgraded the path last year and the path now makes a useful and usable link.



The entrance off the busway path is well signposted and marked with clear signage, though it is debatable as to how long these will last, given that some have been vandalised elsewhere.



There is a token barrier as you join the path, but nothing too difficult for a bike and trailer or trike.



The first striking thing you notice when you join the path is the surface, it's fantastic!

Compared to the grit strewn, noisy, uneven busway path this is a delight. It is 50% recycled tyres and so quiet. It is also slightly soft and very grippy, so far, far safer than the dreadful surfaces covered in grit. It also has a well laid, even finish and looks like it is porous, so water can drain through it.

This should set the standard for all new rural cycle routes!



The route starts on the old railway route,



but drops off the line of the railway on the approach to Mather Fold Road.



Here there is a bit of a diversion round the gates close to the old Valve House - left of the photo below.



Again there are barriers, but not too much of a problem.



Then back up onto the railway route.



However at Hilton Lane there is a missing bridge, so the path drops quite sharply to road level.



A somewhat odd combination cycle/pedestrian crossing doesn't feel particularly safe and not sure about it's legal status...



On the other side of the road the gradient is really steep. According to the plans this shouldn't be any steeper than 1 in 12, but with a sharp corner half way up it's a bottom gear climb or get off and push, with steps for walkers.



Next the bridge takes the path under the railway,



and then opens out for a short while before closing in again



and curving round to the left to join the Roe Green Loopline.



The entrance at this end is marked by another of the large rectangular sign.



The upgrade has turned a difficult muddy route into a useful short link with a fantastic surface. It's so quiet you can enjoy the sound of the birds as you cycle along.


Sunday, 13 May 2018

More restrictions on cycling at Mediacity?

TfGM have put up new maps of the diversions around the tram works in Trafford. At first glance they might be seen as useful information, but a closer look reveals that they have included a cyclists dismount restriction on BOTH bridges across the ship canal.



Detailed map - Wider area map


Anti-cycling notices were posted on the swing bridge in August 2016, exactly 5 years after the place opened - probably to do with the time a developer has to wait before they can ask for their section 106 commitments to be removed.



However, no notices have appeared on the lifting bridge... YET!



TfGM and Peel are in the process of creating a bicycle user group - controlled by the two organisations and these maps are perhaps the first evidence that they may be trying to further restrict cycling on the site?

Monday, 29 January 2018

Salford Cycle Forum

Salford Cycle Forum

1st February 2018, 6.00pm, Swinton Town Hall




AGENDA

1. Welcome and Introductions
2. Action sheet from the last meeting
3. Matters arising
4. Design principles for traffic free routes (Catriona Swanson)
5. Park and Cycle Pilot project (Rose Featherby)
6. City centre cycle connections (/Peter O’Hare/TfGM)
7. Mobike update (Pavol Gajdos)
8. Key Cycle Network Study (Rose Featherby)
9. Cycle forum future – discussion (Andy Salmon)
10. AOB
11. Future Meeting Dates – 3rd or 10th May 2018

Sunday, 12 November 2017

Parking on Cycle Facilities

It's an everyday occurrence...



They really don't give a shit do they...



Even if the road markings say "KEEP CLEAR"!



And when there is plenty of space on the road...



Even better when the cycle track has just been fenced off!



But that doesn't matter to most drivers...



Even when it's dark.



Just imagine what would happen if you blocked the roadway with a bicycle.

Well, you don't need to imagine - just watch this!



More here.




Wednesday, 8 March 2017

Why has there been 14 months of inaction on the Irwell Towpath in Ordsall?

Has my ranting and raving on Twitter finally forced some action on the Irwell Towpath?



This path has been closed since December 2015



This morning was the first time in 14 months I have seen work being carried out on the path.



Rubble was being lifted into the area of the collapsed path and raked into position.



On returning this evening it was clear that this was not a long term repair of the towpath but a short term cludge.



Bags of rocks have been placed in the river to provide an outer edge and rubble has been put in between the bags and the remaining path to build the area up towards path level.



The fact that this is a short term measure begs the question as to why it has take over 14 months to get this far?

Tuesday, 5 July 2016

Middlewood St Update - WTF?

This is what Salford's flagship cycle route, featured on many TfGM leaflets, looks like today...



If proof were needed that Salford Council and it's contractors couldn't give a shit about cycling, then this is it!



Sot armadillos, these pieces of recycled plastic have served their purpose (which was to avoid putting in good quality cycle infrastructure). Now that lie has been accepted by the DfT Salford Council have allowed a developer to wipe out this cycle route without any care for cycling safety.



The priority here is not cycle safety - that was last year.



Now it is all about handing over road space and pavements to developers who couldn't care less.



After all if the occasional person gets killed by an HGV or tipper truck then that is presumably an acceptable price to pay?



Who gives a shit anymore round here?

Sunday, 24 April 2016

Leigh Guided Busway Cycle Track

Most of these photos are from a bike ride a couple of weeks ago, co things may have changed. The rest are from June 2013 as work on the busway began.

This route starts at the end of the Tyldesley Loopline at Ellenbrook. However conditions on this route are dreadful at the moment, so best get to here by road at the moment.

The busway opens out like a huge gaping mouth, and quite dwarfs the cycle track which goes round the back of the shelter to the right.



Quite a contrast to the old cycle route.



The busway entrances all contain car traps - we could do with those on a few cycle lanes!



This was how the signs promotedthe busway durring the early preparation works - note the emphasis on horses - not a cycle to be seen. Clearly the equestrian lobby have good contacts at TfGM.



Evidence of horses is already beginning to accumulate on the path - horse riders should have the same duty as dog walkers to remove their animal's excrement from public places.

The surface of the path is very poor. It is a loose gravel surface and very uneven. It has been clearly chosen to favor horses over pedal cycles. It is almost certainly going to be unsuitable for hand trikes and road bikes.



The road crossings are all on the level, despite this being an old railway route, each equipped with button operated traffic lights. This is the City Road crossing.



The majority of people using the path that day were walking dogs,



but I did see quite a few people on bikes.



There are no barriers to prevent access by cars. However, as there has already been one crash on the busway, there will need to be regular access for cranes to move stranded buses.



This vehicle was from a security firm, parked at the junction with Mosely Common Road. Here the railway line used to go under the road.



Over the road there was fencing across the path, but it had been moved aside.



Here the track was quite narrow and the cycle path goes up onto the embankment, as it did before the works.



The track runs alongside Chester Road with no obvious means of stopping it from being used as a car park once the fencing goes.



More opened fencing at Hough Lane crossing



At this point the old railway track went under a bridge.



This was the view from just beyond in 2013.  Upton Lane still crossed the trackbed by bridge at this point.



The cycle track crosses the busway in a couple of places.



The notices warn that trespass on the busway is a criminal offence - shame the same can't be said for cars on cycleways.



The next road crossing is Well Street.



A little further along the path reaches Astley Street where this bus station has been created.



Again a lot of earth moving has been done to create this.



At this point the path ran out. It is completely un-surfaced and closed between here and Holden Road in Leigh itself. Whilst this could be an excellent route for cycle commuting, TfGM clearly want you to get on the bus.



Whilst the cycle path may be unfinished and poorly surfaced, the car park is properly tarmaced and already in service.



To get to the other end involved a 3.5 mile diversion with road conditions like this...



The other end of the gap at Holden lane.



The last section of path is tarmaced but narrow.



It brings you out to yet more freshly tarmaced car parks.



Two of them, on on either side of the cycle path



which brings you out onto the pavement at East Bond Street.



Generally, this route is a bit of a disappointment. We are pretty sure that the poor quality surface is as TfGM intended, as this message shows.



Hopefully, the rest will be open soon for those who wish to cycle rather than sit on a bus, provided the uneven surface doesn't put them off.