Showing posts with label cobbles. Show all posts
Showing posts with label cobbles. Show all posts

Saturday, 9 January 2016

Irwell Towpath Closed in Ordsall

The floods over the holidays has done considerable damage to the Irwell Towpath in Ordsall. Opposite Pomona tram stop, next to Soapworks the path has been undermined, and much of this section was washed away. Further along the path also seems to be falling towards the river. The gate underneath the tram bridge has been locked shut, so this section is completely unusable and is unlikely to be repaired for many months, and possibly years.



This is in addition to the considerable amount of sand and silt that has been washed onto the lower parts of the path upstream.



So this leaves the many commuters who use this path looking for traffic free alternatives between Salford Quays and Manchester City Centre. You can cycle along Orsall Road, but I wouldn't recommend it.

There are two alternative traffic free routes, though both are unlit, so you need a good set of lights to negociate them at night. The route across Pomona is somewhat disconcerting in the dark, especially with the off-road motorbikes being ridden around, whilst the Bridgewater Canal Towpath is busier, making it feel safer, but you have to concentrate on the path surface to avoid ending up in the canal.

The nearest alternative is across Pomona. Go over the Green Bridge from Woden Street and then go through the gap in the fence on your right before the viaduct and along the muddy path. After a sharp drop the path turns into a wide gravel track.



Here you will be greeted by birdsong and the noise of the trams. Though the birds were quiet on Friday morning because of the presence of a kestrel hovering above the verge.



The track turns to tarmac in places, but watch out for some very deep potholes.



From the bridge over the lock between the Bridgewater Canal and the Irwell the route is then downhill to Pomona Tram Stop.



You then have to get onto the pavement to get through the gate.



From here you get a view of the damage to the towpath and see how it was undermined in the floods.



Then follow the road up to the roundabout by Throstle Nest bridge.



The other alternative route is through Castlefield Basin and along the Bridgewater Canal Towpath. This route has reopened as the remains of the collapsed building have now been removed from the path and the building has finally been demolished.

This is supposed to be an official Velocity Cycle route, but it is pretty poor. The cobbles are quite large and no attempt has been made to fill in the gaps, and on a small wheeled bike you could easilly catch your wheel in one of the gaps and find yourself being thrown into the canal.



There are also several steep bridges over the wharves, which will mean many people will have to get off & push.



The final bridge has a particularly poor surface.



Further along there is a very narrow bridge under a road, though thankfully there is now a handrail which makes it less scary.



And the open sections are covered in thick loose chippings, making it difficult to keep control of the bike, especially when passing cycles coming the other way as you end up on the thicker layers of gravel.



This route again brings you out at Throstle Nest Bridge.

From here there is another section of damage on the Trafford side of the towpath, though it hasn't been closed off yet.



Neither route is ideal, but both offer the chance to avoid the unpleasant experience of cycling on the roads and suffering the threats and abuse from passing motorists...


Monday, 31 August 2015

Speed bumps, locked gates, loose chippings and new dismount signs - Making cycling inconvenient on the Ashton Canal

When I walked along the Ashton Canal back in April the resurfacing was still underway. Progress was promising, with a good quality tarmac surface being laid, though the work did seem to be rather slow. This route is part of the Velocity plans, so the money has come from cycling budgets.



Four months later and the final touches are mostly done.

Final touches designed to make cycling uncomfortable, noisy, dangerous and inconvenient.

Speed bumps

Yes, speed bumps!

So, you put down a decent tarmac surface, then ruin it with these cobbled bumps. There are scores of them all along the path. Total waste of money, money that's supposed to encourage cycling not discourage it.



Locked Gates

Yes, gates which have been open are now locked.

This was last year...



and now. Try getting a bike and child trailer through this - impossible without lifting it over. Remember this is a Velocity route that is supposed to encourage cycling not discourage it.



Loose Chippings

Remember that lovely smooth tarmac surface in the first photo?

Well forget it!

Almost the entire route has been covered in a thick layer of loose chippings. This makes progress along the path slow and noisy, and if that dog runs out in-front of you your brakes will simply lock up so don't bother with the front brake if you want to remain upright.



and then there are the holes, but I'll get to them later...



Cyclists Dismount

Yes, the signs of failure are everywhere, many of them new, presumably paid for with Velocity money. So cycling money is being spent telling people to get off and walk.



There have always been dismount signs on this route, but they are multiplying, thanks to Velocity funding.



The main excuse for them is the narrow path under the bridges.



But no attempt has been made to widen the path or provide alternatives, and in most cases nothing has been done to repair the poor surfaces under the bridges.



Likewise the cobbled surfaces by the locks have not been repaired, despite being in a dreadful condition.



Lighting

Yes, there has been some attempt to put in lighting - solar powered lights in the path, white, except above some locks



where they are red. However, they are unlikely to provide sufficient lighting to persuade most people to cycle along this route in the dark. Many of these lights are shaded by fences & trees so they won't charge up in the winter when they are most needed.

Only a few of these lights have gone in so far at the Manchester end, the rest of the path is covered in holes.



I know from posts on Twitter that many people have gone back to cycling on the road, because the Ashton Canal path is now really inconvenient for daily commuting. Looks like TfGM and the Canal and River Trust have managed to divert cycling money into upgrading a footpath whilst discouraging people from cycling on it.